Cabinet Types and Lead Times for a Bellevue Kitchen

The cabinets are supposed to arrive when the old ones come out. Often they are still weeks away, and bellevue kitchen remodeling ky school breakfast challenge sets the order deliberately so that never happens on a kitchen in Bellevue, WA. The cabinet order is the longest wait in the whole remodeling schedule.
Stock cabinets

Stock cabinets come in fixed widths, usually in three inch steps, and many lines ship from a warehouse in a couple of weeks. The limitation is the fit. A wall that measures forty inches between a window and a corner gets a thirty-six inch cabinet and a filler strip, and the filler is visible. For a simple galley kitchen in Bellevue, WA, stock is a reasonable choice.
Semi-custom cabinets

Semi-custom lines let the buyer change widths, depths, heights and finishes within a catalog. Lead time commonly runs several weeks, because each order is built after it is placed. That is the type most Eastside kitchens end up with, from Factoria ramblers to homes above Lake Sammamish, since it fills odd walls without the full custom wait.
Custom cabinets
A custom shop builds to the drawing, down to the sixteenth of an inch. That suits the sloped ceilings and odd corners found in some hillside homes near Cougar Mountain. The wait is longer, and the shop needs final measurements before it starts, which means the room has to be measured after the old cabinets are out, not guessed at.
Why the order goes in before demolition
If demolition starts first, the family cooks on a hot plate for as long as the cabinets take to arrive. Ordering first reverses that. The old kitchen stays usable until the new boxes are sitting in the garage, and the crew only starts when the delivery date is firm. A job in King County rarely recovers from a late delivery. Boxes get counted against the order sheet the day they arrive, because a missing end panel discovered in week five stops the job.
What slows an order down
Three things stretch the wait: a finish change after the order is placed, a missing dimension, and a back-ordered door style. Ask for a written ship date and a delivery window, and keep the cabinet drawing and the electrical plan together so the hood, the outlets and the upper cabinets agree.
Check before the crew arrives
Unwrap one box of each type, look at the drawer slides and the box joints, and confirm the door color under the kitchen's own light. A mismatch caught in the garage can be fixed. One caught after installation in Bellevue, WA is a different problem.